{"id":23798,"date":"2026-11-24T10:28:00","date_gmt":"2026-11-24T10:28:00","guid":{"rendered":"https:\/\/lefinancierdafrique.com\/open\/?p=23798"},"modified":"2026-11-23T12:39:28","modified_gmt":"2026-11-23T12:39:28","slug":"route-ebolowa-akom-ii-kribi-place-a-la-construction-des-bases-vie-de-lentreprise","status":"publish","type":"post","link":"https:\/\/lefinancierdafrique.com\/open\/2026\/11\/24\/route-ebolowa-akom-ii-kribi-place-a-la-construction-des-bases-vie-de-lentreprise\/","title":{"rendered":"Route Ebolowa-Akom II-Kribi\u00a0 :\u00a0Place \u00e0 la construction des bases-vie de l\u2019entreprise"},"content":{"rendered":"\n<p class=\"wp-block-paragraph\"><strong><em>Selon le Mintp, l\u2019entreprise proc\u00e8de actuellement \u00e0 la construction des b\u00e2timents devant abriter ses installations.<\/em><\/strong><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Les travaux pr\u00e9paratoires \u00e0 la construction de la route Ebolowa-Akom II-Kribi progressent. Selon la note d\u2019information de la cellule de communication du Mintp, dont <em>Le Financier d\u2019Afrique<\/em> a obtenu copie, \u00e0 Akom II comme \u00e0 Ebolowa, les b\u00e2timents des bases-vie sortent de terre et les \u00e9tudes d\u2019ex\u00e9cution se poursuivent. Sur le site r\u00e9serv\u00e9 \u00e0 l\u2019administration, les travaux de fondation \u00e9voluent \u00e9galement \u00e0 un bon rythme. \u00c0 Ebolowa, le terrassement du site devant accueillir les logements et les bureaux touche \u00e0 sa fin. L\u2019entreprise am\u00e9nage \u00e9galement la voie d\u2019acc\u00e8s \u00e0 la base technique, tandis que les \u00e9tudes d\u2019ex\u00e9cution se poursuivent.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Sur le terrain, les topographes r\u00e9alisent les travaux de contr\u00f4le, d\u2019implantation et de lev\u00e9s. Au laboratoire, les analyses des \u00e9chantillons pr\u00e9lev\u00e9s dans les zones mar\u00e9cageuses avancent. L\u2019entreprise pr\u00e9voit d\u2019achever les \u00e9tudes compl\u00e9mentaires d\u2019ici \u00e0 la fin de l\u2019ann\u00e9e.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Par ailleurs, l\u2019emprise du projet est mat\u00e9rialis\u00e9e sur l\u2019ensemble du lin\u00e9aire. La mise en \u0153uvre du Plan d\u2019action de r\u00e9installation se poursuit en concertation avec les commissions d\u00e9partementales, qui examinent les requ\u00eates des populations riveraines. La lib\u00e9ration de l\u2019emprise et le d\u00e9placement des r\u00e9seaux des concessionnaires permettront ensuite de lancer les terrassements.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Pendant ce temps, la circulation est maintenue sur tout l\u2019itin\u00e9raire. La route b\u00e9n\u00e9ficie en outre d\u2019un entretien continu et des mesures ponctuelles ont \u00e9t\u00e9 prises pour \u00e9viter toute interruption du trafic.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">L\u2019entreprise ambitionne d\u2019atteindre le point kilom\u00e9trique 40 en mati\u00e8re de terrassement. La premi\u00e8re \u00e9quipe intervient entre les PK 26 et 30. Elle vient de franchir une zone complexe situ\u00e9e au PK 27+100, o\u00f9 d\u2019importantes op\u00e9rations de purge d\u2019eau ont \u00e9t\u00e9 n\u00e9cessaires. La seconde \u00e9quipe travaille entre les PK 33 et 38, avec des interventions pr\u00e9vues entre les PK 36 et 38, dans une zone n\u00e9cessitant des d\u00e9blais en terrain rocailleux.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Au niveau de la carri\u00e8re, les produits issus du tir d\u2019essai ont \u00e9t\u00e9 concass\u00e9s selon une granulom\u00e9trie 0\/31,5. Plusieurs pr\u00e9l\u00e8vements ont \u00e9t\u00e9 effectu\u00e9s afin de contr\u00f4ler leur conformit\u00e9 granulom\u00e9trique. La reprise de la production des agr\u00e9gats doit contribuer \u00e0 l\u2019approvisionnement du chantier en mat\u00e9riaux n\u00e9cessaires \u00e0 la poursuite des travaux.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">\u00c9valu\u00e9 \u00e0 170 milliards de Fcfa le projet se d\u00e9compose en trois composantes. La section principale couvre 161,6 kilom\u00e8tres, r\u00e9partis entre le tron\u00e7on Ebolowa-Akom II, long de 81,6 kilom\u00e8tres, et le tron\u00e7on Akom II-Kribi, qui s\u2019\u00e9tend sur 80 kilom\u00e8tres. S\u2019y ajoutent deux contournements urbains, l\u2019un de 1,4 kilom\u00e8tre dans la ville d\u2019Ebolowa et l\u2019autre de 12,3 kilom\u00e8tres dans celle de Kribi, ainsi qu\u2019une bretelle d\u2019Akom II longue de 4 kilom\u00e8tres. Le tout repr\u00e9sente un lin\u00e9aire total de 179,3 kilom\u00e8tres.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Selon le Mintp, l\u2019entreprise proc\u00e8de actuellement \u00e0 la construction des b\u00e2timents devant abriter ses installations. Les travaux pr\u00e9paratoires \u00e0 la construction de la route Ebolowa-Akom II-Kribi progressent. Selon la note&hellip; <\/p>\n","protected":false},"author":3,"featured_media":23799,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"advgb_blocks_editor_width":"","advgb_blocks_columns_visual_guide":"","footnotes":""},"categories":[6652],"tags":[9252,6774,9254,9253,7432],"class_list":["post-23798","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-developpement","tag-construction-des-bases-vie","tag-emmanuel-nganou-djoumessi","tag-ministere-de-travaux-publics","tag-plan-daction-de-reinstallation","tag-route-ebolowa-akom-ii-kribi"],"author_meta":{"display_name":"Ferdinand Lemofouet","author_link":"https:\/\/lefinancierdafrique.com\/open\/author\/lefinancier1\/"},"featured_img":"https:\/\/lefinancierdafrique.com\/open\/wp-content\/uploads\/2026\/11\/WhatsApp-Image-2026-11-23-at-13.35.44-1-300x164.jpeg","coauthors":[],"tax_additional":{"categories":{"linked":["<a href=\"https:\/\/lefinancierdafrique.com\/open\/category\/developpement\/\" class=\"advgb-post-tax-term\">D\u00e9veloppement<\/a>"],"unlinked":["<span class=\"advgb-post-tax-term\">D\u00e9veloppement<\/span>"]},"tags":{"linked":["<a href=\"https:\/\/lefinancierdafrique.com\/open\/category\/developpement\/\" class=\"advgb-post-tax-term\">construction des bases-vie<\/a>","<a href=\"https:\/\/lefinancierdafrique.com\/open\/category\/developpement\/\" class=\"advgb-post-tax-term\">Emmanuel Nganou Djoumessi<\/a>","<a href=\"https:\/\/lefinancierdafrique.com\/open\/category\/developpement\/\" class=\"advgb-post-tax-term\">Minist\u00e8re de Travaux publics<\/a>","<a href=\"https:\/\/lefinancierdafrique.com\/open\/category\/developpement\/\" class=\"advgb-post-tax-term\">Plan d\u2019action de r\u00e9installation<\/a>","<a href=\"https:\/\/lefinancierdafrique.com\/open\/category\/developpement\/\" class=\"advgb-post-tax-term\">Route Ebolowa-Akom II-Kribi<\/a>"],"unlinked":["<span class=\"advgb-post-tax-term\">construction des bases-vie<\/span>","<span class=\"advgb-post-tax-term\">Emmanuel Nganou Djoumessi<\/span>","<span class=\"advgb-post-tax-term\">Minist\u00e8re de Travaux publics<\/span>","<span class=\"advgb-post-tax-term\">Plan d\u2019action de r\u00e9installation<\/span>","<span class=\"advgb-post-tax-term\">Route Ebolowa-Akom II-Kribi<\/span>"]}},"comment_count":"0","relative_dates":{"created":"Publi\u00e9 8 heures il y a","modified":"Mis \u00e0 jour 1 jour il y a"},"absolute_dates":{"created":"Publi\u00e9 le novembre 24, 2026","modified":"Mise \u00e0 jour le novembre 23, 2026"},"absolute_dates_time":{"created":"Publi\u00e9 le novembre 24, 2026 10:28 am","modified":"Mise \u00e0 jour le novembre 23, 2026 12:39 pm"},"featured_img_caption":"","series_order":"","_links":{"self":[{"href":"https:\/\/lefinancierdafrique.com\/open\/wp-json\/wp\/v2\/posts\/23798","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/lefinancierdafrique.com\/open\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/lefinancierdafrique.com\/open\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/lefinancierdafrique.com\/open\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/lefinancierdafrique.com\/open\/wp-json\/wp\/v2\/comments?post=23798"}],"version-history":[{"count":1,"href":"https:\/\/lefinancierdafrique.com\/open\/wp-json\/wp\/v2\/posts\/23798\/revisions"}],"predecessor-version":[{"id":23800,"href":"https:\/\/lefinancierdafrique.com\/open\/wp-json\/wp\/v2\/posts\/23798\/revisions\/23800"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/lefinancierdafrique.com\/open\/wp-json\/wp\/v2\/media\/23799"}],"wp:attachment":[{"href":"https:\/\/lefinancierdafrique.com\/open\/wp-json\/wp\/v2\/media?parent=23798"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/lefinancierdafrique.com\/open\/wp-json\/wp\/v2\/categories?post=23798"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/lefinancierdafrique.com\/open\/wp-json\/wp\/v2\/tags?post=23798"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}